Shipbuilding Finance & AccountsCase 05 of 10

Project cost reporting for a shipbuilding programme

A mid-sized shipyard

  • RegionMaharashtra
  • ScopeSix vessels under construction
  • Timeline5 months
  • MarketsIndia
Download the PDF Discuss a similar project
01

Industry overview

What is shaping shipbuilding

Shipbuilding and maritime services depend on a deep supplier ecosystem, skilled workforce and port infrastructure, with long project cycles and strict standards.

  • Supplier capability limits how fast yards can scale
  • Skilled trades are scarce and ageing
  • Port users judge performance on turnaround and reliability
02

Client background

A mid-sized shipyard, working in Maharashtra. Client identity is withheld to protect confidentiality.

Organisation
A mid-sized shipyard
Sector
Shipbuilding
Team engaged
Finance & Accounts
Services
MIS & financial reporting, Accounting & finance consulting, Data analytics & dashboards
03

Client challenge

Each vessel took more than a year to build, and costs were only compared with budgets at milestones. Overruns were discovered too late to correct, and management could not see where money was going.

04

Research objectives

  • Deliver on the brief: project cost reporting for a shipbuilding programme.
  • Establish accurate, reconciled numbers management can rely on.
  • Put a reporting and compliance rhythm in place that runs on time.
05

Target audience

Scope: Six vessels under construction.

Audiences we typically reach in shipbuilding

Shipyards and project managersMarine equipment suppliersSkilled workers and traineesPort users and shipping linesMaritime regulators

06

Geographic coverage

Coverage: Maharashtra. Market: India.

  • India
07

Research methodology

A structured finance engagement: review the current process, set up controls, run the routine and report.

  1. 1Brief
  2. 2Cost structure redesign
  3. 3Project dashboards
  4. 4Insight

We restructured accounts with vessel and work-package codes, linked material issues and labour hours to each vessel, and introduced monthly cost-to-complete reviews. Dashboards compared progress and spending by vessel and package. Project managers and finance staff were trained together, so that cost codes were applied consistently from the shop floor to the accounts.

MIS & financial reportingAccounting & finance consultingData analytics & dashboards

08

Sampling strategy

  • Every ledger, entity and transaction stream in scope was covered, with sample-based checks during review.
09

Data collection

Discovery Plan & design Build / execute Test & refine Launch & handover Indicative split of the 5-month timeline.
  • Source documents, bank statements and ledgers were collected through a secure shared workspace.
10

Data quality & validation

  • Maker-checker review on all entries
  • Bank and ledger reconciliations
  • Client approval before every filing or report
  • Supporting documents kept for every figure
11

Data analysis

  • Variance analysis against budget and prior periods
  • Ratio and trend analysis
  • Cash-flow view for management
12

Key findings

  • Management could see emerging overruns months earlier, especially in outfitting and rework, and took corrective action.
Monthly visibility turned project costs from a surprise into something managed.
13

Recommendations

  • Build on the core insight: monthly visibility turned project costs from a surprise into something managed.
  • Focus effort where the evidence was strongest: management could see emerging overruns months earlier, especially in outfitting and rework, and took corrective action.
14

Business impact

  • Learning from completed vessels improved the accuracy of new bids.
  • Rework costs, previously hidden in general overheads, became visible and were addressed through better coordination between design and production teams.
15

Deliverables & next steps

  • Insight report and management presentation
  • Interactive dashboard
  • Monthly MIS pack and reconciled books
  • Compliance calendar and filings
  • Repeat the measure after changes are in place to track progress.
  • A natural follow-on question: what do stakeholders expect from new projects?

Client identity is withheld to protect confidentiality.

More shipbuilding case studies

  1. 01caseIdentifying local suppliers for a shipyard’s localisation driveA commercial shipyard
  2. 02caseUnderstanding why skilled welders leave shipyardsA shipbuilding and repair company
  3. 03caseWhat ship owners value in a repair yardA ship repair yard
All shipbuilding case studies

Want results like these?

Tell us about your objectives. We'll recommend an approach and confirm feasibility within one working day.

Request a QuoteTalk to an Expert