Construction Market ResearchCase 07 of 10

Citizen feedback on urban infrastructure projects

A smart city mission office

  • RegionA tier-2 city
  • Scope3,000 households
  • Timeline8 weeks
  • MarketsIndia
Download the PDF Discuss a similar project
01

Industry overview

What is shaping construction

Construction materials are chosen by a chain of people: engineers, contractors, masons and individual homebuilders. Site conditions, credit and word-of-mouth all matter.

  • Masons and contractors strongly influence material brands
  • Individual homebuilders rely on trusted advice
  • Site safety and quality standards are rising
02

Client background

A smart city mission office, working in A tier-2 city. Client identity is withheld to protect confidentiality.

Organisation
A smart city mission office
Sector
Construction
Team engaged
Market Research
Services
Government research, Quantitative research, Offline data collection (CAPI)
03

Client challenge

The city had completed several infrastructure projects and wanted to understand citizens’ satisfaction and priorities for the next phase.

04

Research objectives

  • Deliver on the brief: citizen feedback on urban infrastructure projects.
  • Understand the views, needs and behaviour of households.
  • Produce results that can be compared across groups and locations.
  • Give the client evidence it can act on within 8 weeks.
05

Target audience

The work focused on 3,000 households.

  • households3,000

Audiences we typically reach in construction

Contractors and masonsCivil engineers and architectsIndividual homebuildersMaterial dealersSite workers

06

Geographic coverage

Coverage: A tier-2 city. Market: India.

  • India
07

Research methodology

A structured quantitative design, so results could be compared across groups, locations and time.

  1. 1Brief
  2. 2Household survey
  3. 3Ward-level analysis
  4. 4Insight

We surveyed households across all wards about roads, footpaths, drainage, lighting and public spaces, with results analysed by ward.

Government researchQuantitative researchOffline data collection (CAPI)

08

Sampling strategy

households
3,000
  • Respondents were selected across A tier-2 city using quotas set in advance for each location and respondent type, so no single area or group dominated.
09

Data collection

Brief & design Sampling & set-up Fieldwork Analysis Reporting Indicative split of the 8-week timeline.
  • Trained local-language interviewers conducted interviews in person on tablets (CAPI), with time and location recorded for every interview.
10

Data quality & validation

  • Back-checks on a share of completed interviews
  • Time and location checks on field interviews
  • Supervisor accompaniment in the field
  • Logic and range checks on the final data
  • Work carried out under our ISO 20252 quality procedures
11

Data analysis

  • Cross-tabulation by key groups and locations
  • Significance testing on the differences that mattered
12

Key findings

  • Drainage and footpaths remained top priorities in older wards.
Ward-level results guided targeted decisions.
13

Recommendations

  • Build on the core insight: ward-level results guided targeted decisions.
  • Focus effort where the evidence was strongest: drainage and footpaths remained top priorities in older wards.
  • Re-measure after the changes to confirm the effect.
14

Business impact

  • The city adjusted its next-phase plans to prioritise those wards.

What changed in the business as a result of the work. Impact is described qualitatively.

15

Deliverables & next steps

  • Insight report and management presentation
  • Cleaned data file and data tables
  • Evaluation findings with programme recommendations
  • Repeat the measure after changes are in place to track progress.
  • A natural follow-on question: what do homebuilders worry about most?

Client identity is withheld to protect confidentiality.

More construction case studies

  1. 01caseHow masons and contractors influence cement brand choiceA cement manufacturer
  2. 02caseDesigning a housing project around buyer needsA residential developer in South Africa
  3. 03caseEvaluating a safety programme on construction sitesAn infrastructure construction company
All construction case studies

Want results like these?

Tell us about your objectives. We'll recommend an approach and confirm feasibility within one working day.

Request a QuoteTalk to an Expert